The PzKpfw III (Panzerkampfwagen III) was a German medium tank from the Second World War. The first prototypes of the vehicle were made in 1936, and serial production continued in the period 1937-1943, ending with the production of about 5,800 vehicles. The tank in the E version was powered by a single Maybach HL 120 TRM engine with a capacity of 300 HP. It was armed with one 37mm KwK 35/36 cannon and two 7.92mm MG 34 machine guns. placed in the tower.
PzKpfw III was the “workhorse” of the German armored forces during World War II and one of the most intensively developed and modernized Wehrmacht tanks. Its serial production started in 1936, and many variants of this tank were created in its course. Chronologically, the first version was the A version, armed with a 37mm gun and a 230hp engine. However, already in December 1938, the E version was created, which was the first version produced in large series. It had a new, significantly more powerful engine, a completely new suspension and stronger armor in the front part of the turret and hull. Later (from December 1940) it was also armed with a more powerful 50mm cannon. In March 1940, the G version began to be produced, in which the rear hull and turret armor was reinforced. Soon after, in October 1940, the production of the H version started, which from the very beginning was armed with the 50mm KwK 38 L / 42 gun and had reinforced frontal armor. One of the most produced was the J version, which had armor up to 50 mm thick (later reinforced with aplique plates), and after the experience gained from the clashes with the T-34 and KW-1 vehicles – it was intensively rearmed for the KwK 39 L / 60 cannon. cal. 50 mm. The last development version was the N version, which was to be a support tank for armored grenadiers and was armed with a 75mm KwK 37 L / 24 short-barreled cannon. Numerous other vehicles were built on the chassis of the PzKpfw III, such as the StuG III assault gun. PzKpfw III tanks were used on almost all fronts of World War II – from the September campaign in 1939, through the campaign in France in 1940, operations Barbarossa and Typhoon in 1941, the Battle of Kursk in 1943, to the last operations of the German army against The USSR and the Western Allies in 1944-1945.

GAUGEMASTER DCC92 RUBY SERIES 2FN SMALL DCC DECODER 8 PIN
HORNBY R7338 Maglight Lighting Unit for 4/6 Wheel Coaches
bhPL-32 Microswitch, open type
Hornby R8245 Digital Sapphire Decoder
R8014 Hornby Point Motor
R7150 Standard 6 pin Decoder
GAUGEMASTER GM950 On the Footplate (6) Figure Set OO SCALE
Hornby R047 On-Off Lever Switch
Gaugemaster GMC-PM2 Seep Point Motor
Peco PL-22 On Off Switch
GAUGEMASTER GM11GR GREY WIRE (7 X 0.2MM) 10M
DCC CONCEPTS LML-MSL 4mm Scale Modern Post Lamps – Grey (3 pack)
OXFORD DIECAST 76VWS010 VW T1 Camper Titan Red/Beige Grey
Academy 13280 1/35 German Light Tank Pz.Kpfw. 35(t)
A04301V Airfix Vintage Classics Churchill Bridge Layer Kit 1:76 Scale
Heller 82755 1/24 Car Mechanics I
A01304V Airfix Vintage Classics Churchill Mk.VII Kit 1:76 Scale
A01309V AIRFIX VINTAGE CLASSICS Bren Gun Carrier & 6PDR Anti-Tank Gun 1:76
A02303V Airfix Vintage Classics 88mm Gun & Tractor Kit 1:76 Scale
RAPIDO 951005 GWR 44xx No.4404 British Railways (serif) Green
Academy 13270 M3 Stuart 'Honey' 1:35 Model Kit
J6035 Airfix QUICKBUILD Ford Mustang GT 1968 Red
A01311V Airfix Vintage Classics Sd.Kfz.234 Armoured Car Kit 1:76 Scale 





Reviews
There are no reviews yet.