RATIO 733
LMS 50FT ARC ROOF CORRIDOR BRAKE COMPOSITE COACH KIT
A total of 650 coaches of this type were built at Wolverton between 1891 and 1903 by the London and North Western Railway for main line service and many of them were transferred into the LMS after the 1923 Grouping. Glue, paint and transfers are required to complete this model.

PO236 Metcalfe OO/H0 Footbridge Kit
Peco SL-300F Code 55 Finescale Wooden Sleeper Flexible - N
HORNBY R40247A East Coast, Mk3 Trailer Standard, 42192 - Era 10 








Reviews
There are no reviews yet.