At the end of the first decade of the 20th century, the upsurge in the growth of mineral traffic in the North-East exceeded the amount of steam haulage available to transport it. The existing North Eastern Q5 locomotives, designed by Wilson Worsdell, were extremely capable engines but the new Chief Mechanical Officer, Vincent Raven, felt a more powerful, superheated design would be justified in the circumstances.
Between February 1913 and March 1921, 120 examples of Ravenâs new T2 eight-coupled locomotive were built, in six batches, resulting in a powerful, sturdy and reliable engine design that fulfilled its requirement to haul mineral and heavy freight traffic, right through to late 1967. The first seventy were built at Darlington, with the last batch of fifty being constructed by Armstrong Whitworth & Co. of Newcastle.

MISTER CRAFT 070014 1:72 F-35A LIGHTNING II KIT
Humbrol No.28 CAMOUFLAGE GREY 14ml MATT Enamel Tinlet
CADA C55108W Mini Grey Circuit Racing Car - 70 pcs
RAPIDO 903017 16″ Hunslet – “Primrose No.2” (Late Condition)
REVELL 03981 Focke Wulf Ta 152 H 1/72 SCALE
A01311V Airfix Vintage Classics Sd.Kfz.234 Armoured Car Kit 1:76 Scale
Dapol 2F-036-055 N Gauge Bulk Grain Hopper GWR Avonmouth 42313
RAPIDO 914007 HR ‘Jones Goods’ 4-6-0 – BR Lined Black No.57925 















Reviews
There are no reviews yet.