At the end of the first decade of the 20th century, the upsurge in the growth of mineral traffic in the North-East exceeded the amount of steam haulage available to transport it. The existing North Eastern Q5 locomotives, designed by Wilson Worsdell, were extremely capable engines but the new Chief Mechanical Officer, Vincent Raven, felt a more powerful, superheated design would be justified in the circumstances.
Between February 1913 and March 1921, 120 examples of Ravenâs new T2 eight-coupled locomotive were built, in six batches, resulting in a powerful, sturdy and reliable engine design that fulfilled its requirement to haul mineral and heavy freight traffic, right through to late 1967. The first seventy were built at Darlington, with the last batch of fifty being constructed by Armstrong Whitworth & Co. of Newcastle.

PN940 Metcalfe N Gauge Platform Canopy Kit
TAMIYA 24100 Honda NSX 1:24 Car Model Kit
PO205 Metcalfe OO/H0 Low Relief Pub and Shops Kit
Humbrol No.67 TANK GREY 14ml MATT Enamel Tinlet
SIKU 0811 REFUSE TRUCK 1/76 ,
BIGJIGS Rail Heritage Collection Rocket Engine Wooden Train
Atlantis A502 1/48 H-25 HUP-2 Army Mule Helicopter
DAPOL 4S-001-006S 7800 CLASS 7810 'DRAYCOTT MANOR' BR GREEN (DCC-SOUND)
OXFORD DIECAST Austin Maestro Black by Oxford at 1:76 scale.
DAPOL 4S-001-005 7800 Class 7819 'Hinton Manor' BR Early Black OO GAUGE
Revell 07449 - 2014 Corvette (Easy Click) 1:25
OXFORD DIECAST 76105003 Anglia Police Panda - 1:76 Scale
RAPIDO 942013 SECR Wagons Pack 1 – BR Livery Freight Train N GAUGE 













Reviews
There are no reviews yet.