At the end of the first decade of the 20th century, the upsurge in the growth of mineral traffic in the North-East exceeded the amount of steam haulage available to transport it. The existing North Eastern Q5 locomotives, designed by Wilson Worsdell, were extremely capable engines but the new Chief Mechanical Officer, Vincent Raven, felt a more powerful, superheated design would be justified in the circumstances.
Between February 1913 and March 1921, 120 examples of Ravenâs new T2 eight-coupled locomotive were built, in six batches, resulting in a powerful, sturdy and reliable engine design that fulfilled its requirement to haul mineral and heavy freight traffic, right through to late 1967. The first seventy were built at Darlington, with the last batch of fifty being constructed by Armstrong Whitworth & Co. of Newcastle.

PN840 Metcalfe N Gauge Goods Yard Crane Kit
TASMA 00903 N Gauge Water Iris (16)
PO283 Metcalfe OO/H0 Small Factory Kit
RAPIDO 914002 HR ‘Jones Goods’ 4-6-0 – HR Jones Green (1890s condition)
PO289 Metcalfe OO/H0 Fire Station Kit
HELJAN 3940 Gresley O2/4 3479 LNER Black
BACHMANN 36-015 Metal 3-Hole Wagon Wheels (x10)
AIRFIX A02029B Messerschmitt Bf109G-6 1:72 Scale
Ratio 216 N Gauge Lineside Fencing (White) Kit
METCALFE PO296 OO/HO Gauge Castle Wall Bridge
EFE RAIL E85014 LSWR Adams O2 205 LSWR Urie Green OO GAUGE 











Reviews
There are no reviews yet.