Product Info
In-order to allow running at 125 mph on Britain’s railways, new rolling stock was needed by British Railways, and a new Mark entered service in 1975. Significant improvements over the Mk2 included new secondary air suspension between the bogies and the coach body as well as aerodynamic skirting on the underframe. Mk3 Coaches are 75ft (23m) long enabling far greater capacity than older coaches. Mk3 Coaches also incorporate disk brakes and wheel slip protection enabling faster deceleration.
The first Mk3 Coaches to be delivered were used as part of the HST prototype along with the two Class 41 diesel power cars in 1972. Mk3 Coaches entered service in 1975 along with the Class 43 forming the iconic InterCity 125 trainset.
After the HST Mk3 Coach variant was introduced, further Mk3 coaches were introduced to the West Coast Mainline for use as part of locomotive hauled trains. Mark 3s remain in service as part of HSTs with East Coast Trains among other companies.
Tech Specs
Item Length – Without Packaging (cm)
30.3
Item Scale
1:76 Scale 00 Gauge
Finish
Painted
Colour
Grey
Operator
East Coast
Designer
BREL
Livery
East Coast Grey
Minimum Curve (mm)
Radius 2

PREISER 10767 CHILDREN PLAYING (5) EXCLUSIVE FIGURE SET HO/OO
Javis JS32 Dark Brown Scatter
PO321 Metcalfe OO/H0 Parcel Offices Kit
Metcalfe M0058 OO/H0 Semi Cut B1 Stonework Sheets
M0051 Metcalfe OO/H0 Cobblestone Sheets
OXFORD DIECAST OD76T5V004 Oxford Diecast VW T5 Van Network Rail
PO206 Metcalfe OO/H0 Low Relief Cinema & Shops Kit
PO333 Metcalfe OO/H0 Settle / Carlisle Railway Station Kit
EFE RAIL E87039 SPA OPEN WAGON NETWORK RAIL YELLOW WEATHERED
Humbrol No.31 SLATE GREY 14ml MATT Enamel Tinlet
PN830 Metcalfe N Gauge Market Stalls Kit
M0052 Metcalfe OO/H0 Dressed Gritstone Sheets
CADA C55116W Mini Crossblade Runner SUV - 66 pcs
Gaugemaster GMKD32 Semi Detatched Houses - N Gauge
Metcalfe PO380 00/H0 SCALE RAILWAY ARCHES
BACHMANN 39-452A LMS 57ft 'Porthole' Second Corridor BR Blue & Grey 






Reviews
There are no reviews yet.